Defensible numbers for owners, developers, and project teams, built from the ground up by field estimators who have priced, bid, and built sitework for their entire careers. When your budget needs to hold up in front of a funding board, a lender, or a bid opening, it should come from people who know what the work actually costs to build.

Why It Exists

A Budget Is Only as Good as the Estimator Behind It

Owner budgets fall apart for the same reasons bids do: numbers that looked fine on paper and didn't hold up in the field. We build owner-side numbers the same way we build bids: from quantities up, priced from the geotech and real production and haul costs, with every assumption documented.

Independent Cost Estimating

Budgets built from clearly defined quantities, assumptions, and risks, so your team understands what drives the number.

  • Opinion of Probable Construction Cost (OPCC) estimates
  • Quantity-based estimates at concept, schematic, DD, and CD milestones
  • Written assumptions, inclusions & exclusions with every deliverable
  • Independent review of contractor or designer estimates
  • Bid-day comparison and reconciliation against received bids

Risk Identification & Contingency Development

Most budget busts on sitework aren't estimating errors. They're risks nobody priced. Geotech surprises, over-excavation, import/export swings, groundwater, and utility conflicts all live in the documents before they live in a change order. We find them early, quantify the exposure, and build contingencies with a rationale instead of a flat percentage.

  • Design, permitting, geotechnical & construction risk identification
  • Risk-based estimating and contingency development
  • Evaluation of alternative approaches to reduce cost exposure
  • Support for owner decision-making and risk allocation in contracts

Value Engineering & Design Optimization

Value engineering should improve constructability and cost without changing the project's intent, and it takes someone who understands means and methods. We price alternates the way they'll actually be bid: haul cycles, phasing, equipment logic, and what the crew will actually do with the drawing.

  • Evaluation of alternative design concepts and pavement/earthwork sections
  • Cost-benefit analysis of proposed changes, with quantities to back it
  • Participation in formal value engineering workshops
  • Constructability review informed by real-world means & methods
  • Site balance and grading optimization to cut import/export costs

Budget Development & OPCC Support

A budget is a living document that has to track every design decision from planning through procurement. We build and maintain cost models with full traceability: when the number moves, your team knows exactly which scope change moved it and can answer for it.

  • Budget development at planning and design milestones
  • Cost model updates and milestone-to-milestone reconciliation
  • Scope and cost change tracking with a clear audit trail
  • Support during funding, approval, and procurement processes

Who Uses Owner-Side Estimating

Developers budgeting land development and horizontal infrastructure. Public agencies needing independent OPCCs for funding packages. General contractors validating a sitework budget before GMP. Design teams that want cost feedback grounded in construction reality, at the milestones where changes are still cheap to make. If the dirt scope is the biggest question mark in your budget, that's the scope we know best.

Turnaround

Milestone estimates and reviews are scheduled around your design calendar, with typical deliverables in 3–7 business days depending on project size and document completeness. Your quote is confirmed with you before any work starts. For ongoing design support, we can align to your milestone schedule so cost feedback lands while decisions are still open.

Owner Estimating Questions

What is an OPCC?

An Opinion of Probable Construction Cost (OPCC) is an estimate of what a project should cost to build, prepared during planning and design. It is called an opinion because the preparer does not control labor, material, or bidding conditions. See our full guide: OPCC meaning in construction.

When should an owner get an independent cost estimate?

At each design milestone (concept, schematic, design development, and construction documents), before funding or lender submissions, and before bid opening so received bids can be reconciled against an independent number.

Do you review contractor or designer estimates?

Yes. We provide independent review of contractor and designer estimates, plus bid-day comparison and reconciliation against received bids.

Need a number you can defend?